ORC Standard Operating Procedure

Prior to handling of any remediation compound, be certain to familiarize yourself with all safety and health risks associated with the specific compound, including, but not limited to safe dilution concentrations and the handling procedures. Always wear appropriate Personal Protective Equipment (PPE). If you are not familiar with the safety and health risks, do not handle any compound.
Using a Direct Push Rig, advance 1.5" O.D. injection tooling to the bottom of the desired injection zone.
Once target depth has been reached, install injection cap, attach exterior rod grip handle, and connect injection hose to the injection tooling.
Prepare ORC slurry in the Vironex delivery system.
Activate injection pump and begin the injection process while simultaneously retracting the injection tooling. Adjust the retraction rate of he injection tooling to match the flow rate of the pump. This is to ensure even vertical distribution of the remedial compound into the desired injection zone or zones.
Once the desired amount of injection compound has been injected, shut down the pump, and continue to retract the injection tooling.
Once the injection tooling has been removed from the borehole, backfill the boring with appropriate backfilling material, and patch the surface to match existing surface material.
Regenesis ORC Installation Instructions